Goleta Beach, 17 December 2002: afternoon, low tide, two
backhoe operators converse about rebuilding the berm in front of the
Goleta Beach west parking lot. ©AGS 2002. |
 |
Goleta Beach, 17 December 2002: a few minutes later, the
two backhoes are back to work, dredging sand from the existing beach
and piling it on the damaged beach bluff to protect it from the waves
of the next high tide. ©AGS 2002. |
 |
Goleta Beach, 17 December 2002: By dredging the sand from
the existing beach, the waves on the next high tide were able to attack
the new berm directly - and did. ©AGS 2002. |
 |
Goleta Beach, 17 December 2002: Some sand from the previous
berm has been spread upon the grass by waves on the last high tide.
The tides are astronomic at this time with the higher high tide being
about 6.5' and the lower low tide being about -1'. ©AGS 2002. |
 |
Goleta Beach, 17 December 2002: Construction of another sand
berm to protect damaged beach bluff. The shiny dark rock in the center
of the picture was overlain by soil and grass that were striped away
by waves from the storm of the previous day. East end of beach. ©AGS
2002. |
|